PROJECT

Mahon Bridge

The project was the replacement of the existing concrete bridge that was constructed in 2009 and damaged in the January 2013 flood event.  Following the floods a number of deficiencies were identified with the bridge which necessitated a load restriction to be imposed and a reduction in capacity from two to one lane.  A funding submission was required to secure funding for the new bridge.   

Mahon Bridge, Lockyer Valley
PROJECT HIGHLIGHTS

Location

Lockyer Valley, Queensland

Client

Lockyer Valley Regional Council

Project Value

approx $6.9 million

Contract Period

2022 - 2025

Services

Strategic Advisory Services

PROJECT BACKGROUND

Mahon Bridge was constructed in 2009. During the January 2013 flood event, the bridge was found to have a number of deficiencies which necessitated imposing load restrictions on the bridge and reducing the capacity from two to one lane.

Lockyer Valley Regional Council (LVRC) wanted to reinstate the two lanes as it was a vital heavy vehicle access for commercial enterprises.

Following several unsuccessful funding submissions to the Commonwealth Government, LVRC lacked sufficient funding and engaged CPM to prepare a business case to support a renewed successful funding application.

Mahon Bridge work in progress
CPM SCOPE OF WORK
  • CPM was engaged by LVRC to develop a comprehensive business case to support a funding application for the replacement of the bridge. The business case included detailed definition of the project scope, cost estimates, delivery program, and identification of all necessary planning and environmental approvals. CPM ensured the business case met the Commonwealth Government’s investment criteria, resulting in a successful funding outcome.
  • Following the Commonwealth conditional funding approval in early 2023 (contingent on project completion within a two-year window) LVRC re-engaged CPM to provide project delivery support.
  • CPM recommended a standard design bridge that would meet the timing requirement and addressed identified risks.
  • CPM submitted a reverse design brief in late April 2023 with investigation works commencing on the project in early June 2023.
  • CPM developed Project Management Plans to help understand the project risks and opportunities.
  • CPM also worked with LVRC to ensure the design maximised benefits with the available budget.
  • Design, resumptions and early procurement were completed in 2024.
  • CPM Civil was engaged to construct the bridge for the council as a part of the proposal.
KEY ACHIEVEMENTS

Successful Funding Acquisition and Strategic Planning

CPM successfully secured Commonwealth Government funding for the replacement of the bridge, overcoming prior unsuccessful attempts by the client. In doing so, CPM developed a compelling business case and provided strategic guidance to ensure alignment with funding program criteria. Upon approval, CPM fast-tracked critical pre-construction activities – including planning, approvals, and procurement processes to meet stringent timeframes associated with the funding agreement.

Seamless Transition to Construction Delivery and on-time delivery

Construction of the new bridge commenced in January 2025, led by LVRC with CPM Civil as the delivery contractor. CPM played a key role in coordinating project start-up activities, ensuring a smooth transition from planning to delivery. Works were completed within the stipulated funding timeline, demonstrating disciplined project controls and effective stakeholder coordination.

Enhanced Safety

The new bridge meets the AS5100 standards and supports heavy vehicle loads.

Community Benefit

Restored connectivity and improved flood resilience

RELATED PROJECTS
The Wave Sunshine Coast Rail Line Concept Rendering

The Wave (Sunshine Coast Rail Line)

The Wave is a major Queensland Government public transport initiative delivering a new passenger rail line from Beerwah to Birtinya, with a metro-style connection to the Sunshine Coast Airport via Maroochydore. Sunshine Coast Council engaged CPM to provide strategic advisory and technical support to negotiate an Interface Deed with the Department of Transport and Main Roads (TMR), ensuring Council’s long-term interests, obligations and community outcomes are protected across all stages of this transformational project.

Flood affected road in Toowoomba region

DTMR Darling Downs Disaster Recovery

The DTMR Darling Downs district was affected by multiple flood disaster events across 2021 and 2022. The events triggered the requirement for various projects across the road network under DRFA, NDRRA, Emergent works and Betterment funding categories.

Petrie Mill Development

The Mill Redevelopment

The Mill at Moreton Bay Priority Development Area (PDA) is approximately 460 hectares and is located within the suburbs of Petrie, Kallangur and Lawnton. City of Moreton Bay is creating a thriving major destination that will generate thousands of local higher education and employment opportunities in the region.